ADU Construction Cost in Burbank, CA (2026)
A adu construction in Burbank costs $315–$525 per sq ft, with a typical mid-size ADU running $95k–$189k. Small projects start around $63k; large or high-end work can reach $473k or more.
Costs in Burbank run about 5% above the LA County baseline due to tight lot sizes and studio-zone demand on local trades.
ADU Construction Cost by Size in Burbank
Totals adjusted for the Burbank market (1.05× LA County baseline). Ranges include labor, materials, permits, and contractor overhead.
| Size | Type | Range | Low | High |
|---|---|---|---|---|
| Small | JADU / studio | 150–400 sq ft | $63k | $137k |
| Medium | 1-bed garage conversion | 400–600 sq ft | $95k | $189k |
| Large | Detached 2-bed | 800–1,200 sq ft | $263k | $473k |
What Affects ADU Construction Cost in Burbank?
- ADU type (JADU vs attached vs detached).
- Site prep and grading.
- Utility connections.
- CA Title 24 energy compliance.
- City ADU permit timeline.
- Burbank market premium: local pricing reflects tight lot sizes and studio-zone demand on local trades, which shifts totals about 5% above the LA County baseline.
Get exact adu construction bids in Burbank
We'll match you with up to 3 licensed Burbank contractors.
Get MatchedADU Construction Sub-Type Comparisons
Garage Conversion ADU vs Detached ADU
Garage conversions reuse the existing slab and shell at $90k–$180k; a detached new-build ADU runs $250k–$450k but unlocks larger floor plans and higher rent.
Junior ADU (JADU) vs Attached ADU
A JADU (≤500 sq ft, within the home) runs $60k–$130k and shares utilities; an attached ADU is a true second unit at $150k–$350k with its own entrance and meter.
How to Get the Best Price on a ADU Construction in Burbank
- Get 3 line-itemized bids on the same scope through Keystone Connect — Burbank adu construction pricing varies 10–25% between contractors.
- Lock major materials and finishes before signing; mid-project change orders are the #1 cost driver on adu construction jobs.
- Bid in shoulder seasons (Jan–Mar or Sep–Oct) when Burbank contractor schedules are open and rush premiums disappear.
- Verify CSLB license, insurance, and bond before paying any deposit. California caps deposits at $1,000 or 10% of contract, whichever is less.
Frequently Asked Questions — ADU Construction in Burbank
Need more answers? Visit our contractor FAQ hub.
Get Matched with Licensed Burbank Contractors
Tell us about your adu construction and we'll match you with up to 3 vetted contractors.